Steel Fabrication
An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.
Fabrication
» Click here for Case Study
Areas in which PVA has worked:
Foundries
Areas in which PVA has worked:
Fabrication
» Click here for Case Study
Areas in which PVA has worked:
- Planning and Scheduling
- Design and Drafting
- Engineering
- Preparation
- Joists
- Bending
- Assembly
- Welding
- Galvanizing
- Maintenance
- Shipping and Receiving
- Yard
Performance Improvements:
- 50% in the attainment of estimated hours
- 30% in tonnage produced and flow through rates
- 25% in the uptime of the cutting equipment
- 50% in the utilization of the equipment
- 30% in labor productivity (hours worked per tons produced)
- 300% in front line active supervision levels
- 30% in the order to delivery cycle time
- 30% in the downtime of the welding equipment
- 50% in overtime levels
- 98% ship on-time attainment levels
- 50% in short shipments and miss-shipments
Foundries
Areas in which PVA has worked:
- Planning and Scheduling
- Procurement and Purchasing
- Preparation
- Furnace and Melting
- Safety
- Housekeeping
- Maintenance
- Shipping and Receiving
Performance Improvements:
- 50% in the attainment of estimated times
- 30% in the tonnage produced and flow through rates
- 25% in the uptime of operational equipment
- 50% in the utilization of the equipment
- 98% ship on-time attainment levels
- 50% in cycle times
- 30% in unscheduled downtime of the equipment
- 50% in overtime levels
- 50% in short shipments and miss-shipments
Case Study 1: Structural Steel Solutions for any Project
Case Study 2: 180 Degree Turnaround