Steel Fabrication

An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.


Fabrication


                                                                                        » Click here for Case Study
Areas in which PVA has worked:

 

  • Planning and Scheduling
  • Design and Drafting
  • Engineering
  • Preparation
  • Joists
  • Bending
  • Assembly
  • Welding
  • Galvanizing
  • Maintenance
  • Shipping and Receiving
  • Yard


 

Performance Improvements:

 

  • 50% in the attainment of estimated hours
  • 30% in tonnage produced and flow through rates
  • 25% in the uptime of the cutting equipment
  • 50% in the utilization of the equipment
  • 30% in labor productivity (hours worked per tons produced) 
  • 300% in front line active supervision levels
  • 30% in the order to delivery cycle time
  • 30% in the downtime of the welding equipment
  • 50% in overtime levels
  • 98% ship on-time attainment levels
  • 50% in short shipments and miss-shipments




Foundries



Areas in which PVA has worked:

 

  • Planning and Scheduling
  • Procurement and Purchasing
  • Preparation
  • Furnace and Melting 
  • Safety
  • Housekeeping
  • Maintenance
  • Shipping and Receiving  

 


Performance Improvements:

 

  • 50% in the attainment of estimated times
  • 30% in the tonnage produced and flow through rates
  • 25% in the uptime of operational equipment
  • 50% in the utilization of the equipment
  • 98% ship on-time attainment levels
  • 50% in cycle times
  • 30% in unscheduled downtime of the equipment
  • 50% in overtime levels
  • 50% in short shipments and miss-shipments


    Case Study 1: Structural Steel Solutions for any Project
    Case Study 2
    180 Degree Turnaround