Oil and Gas
An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.
Areas in which PVA has worked: » Click here for Case Study
-
Planning and Scheduling
- Field Operations
- Field Maintenance
- Rigs Maintenance
- Plant Operations
- Plant Maintenance
- Procurement and Purchasing
- Materials Consumption
- Plant Yield
Performance Improvements:
- 27% in lost time at the start and end of the operating shifts
- 21% in operational throughput levels
- 25% in meters drilled per operating hour
- 30% in total volume gas
- 15% in total volume oil
- 300% in active supervision levels
- 60% in the number of wells approved
- 40% in labor cost per well work over
- 15% in operating efficiency
- 16% in equipment availability
- 10% in Plant throughput levels and run rates
- 46% in non-value added activities and lost time
- 50% in maintenance cycle times
- 68% in maintenance schedule attainment
- 35% in maintenance urgencies
- 40% in unscheduled equipment breakdowns
- 25% in Outside Contractor costs
Case Study 1: Achieving a Climate of Continuous Improvement
Case Study 2: Improving Third Party Performance
Case Study 3: Building a Team Environment by Increasing Accountability