Mining

An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.


Areas in which PVA has worked:                                    » Click here for Case Study

 

  • Planning and Scheduling
  • Mine Operations
  • Mine Maintenance
  • Plant Operations
  • Plant Maintenance
  • Wellfield Operations
  • Drying and Shipping
  • Wellfield Construction
  • Wellfield Installation and Geology
  • Restoration and Plugging
  • Laboratory
  • Water Sampling
  • EHS
  • Engineering
  • Administration
  • Procurement and Purchasing
  • Materials Consumption
  • Plant Yield

 


Performance Improvements:

 

  • 27% in lost time at the start and end of the operating shifts
  • 21% in BCM’s moved in the mine
  • 25% in meters drilled per operating hour
  • 5% in the mine operating efficiency
  • 16% in the equipment’s availability
  • 10% in Plant throughput levels and run rates
  • 300% in active supervision levels
  • 30% in pounds produced per direct manhour
  • 30% in indirect labor productivity
  • 45% in the number of wells connected 
  • 46% in non-value added activities and lost time
  • 40% in unscheduled equipment breakdowns
  • 25% in Outside Contractor costs


    Case Study: The Selection of Metrics was Key