Injection and Blow Molding
An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.
Areas in which PVA has worked: » Click here for Case Study
-
Planning and Scheduling
- Extrusion
- Blow and Injection Molding
- Fabrication
- Tool Shop
- Maintenance
- Quality Assurance and Control
- Material Utilization
- Shipping and Receiving
- Warehouse
Performance Improvements:
- 22% in schedule attainment
- 30% in plant throughput and capacity
- 50% in plant running uptime requirements
- 17% to 35% in labor productivity
- 300% in active supervision levels
- 10% in unscheduled downtime
- 36% in overtime hours
- 28% in set-up and change-over times
- 100% compliance to the testing procedures
- 18% in scrap and yield levels
- 20% in kgs blended
- 100% attainment to PM requirements
- 50% in sub-contracting costs
Case Study: Optimizing Reources Across the Entire Operation
