Aerospace
An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.
Areas in which PVA has worked:
- Planning and Scheduling
- Aircraft Maintenance
-
Shops:
- Upholstery
- Wood
- Hydraulics
- Avionics
- Sheet Metal
- Quality Assurance and Control
- Design
- Engineering
- Stores
- Warehousing
- Checklines
- Crew and Pilot Scheduling
- Simulator Training and Outsourcing
- Inventory Control
- Procurement and Purchasing
- Cargo
- Accounting
- Finance
- Call Centers
Performance Improvements:
-
30% in the ratio of billable hours versus total hours worked
-
32% in overall labor productivity
-
100% in schedule attainment
-
25% in overrun hours
-
15% in equipment uptime
-
25% in simulator available hours
-
75% in CSR response times
-
100% in maintenance response times
-
25% in maintenance operating costs
-
15% in parts and tools costs
-
200% in active supervision levels at first line
-
35% in Warehouse response time
-
25% in Checkline cycle times
-
5% in Inventory costs
-
25% in training footprints
-
50% in call abandonment levels
-
50% in non-emergency overtime levels
-
20% in SNAGS
Case Study: currently under development
