Manufacturing

An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.


Areas in which PVA has worked:                                    » Click here for Case Study

 

  • Supply Chain
  • Design
  • Engineering
  • Research and Development
  • Order Entry
  • MRP and ERP and PRP
  • Planning and Scheduling
  • Procurement and Purchasing
  • Logistics
  • Production
  • Fabrication
  • Assembly
  • Maintenance
  • Quality Assurance and Control
  • Shipping and Receiving
  • Accounting
  • Finance
  • Human Resources
  • Customer Service
  • Information Technology

 

 

Performance Improvements:

 

  • 60% in Order Entry errors
  • 40% in Engineering Change Notices
  • 50% in operational capacity and throughput
  • 50% in operational cycle times
  • 300% in active supervision levels
  • 30% in direct and indirect labor productivity
  • 30% in effectiveness and performance
  • 30% in manufacturing lead times
  • 50% in turnaround times
  • 20% in the order fulfillment cycle time
  • 10% in purchasing costs
  • 30% in WIP Inventory levels
  • 10% in Inventory levels and carrying costs
  • 100% attainment to On-time Delivery levels
  • 50% in premium freight costs


    Case Study 1:  Customer Satisfaction is #1
    Case Study 2:  Optimizing Resources Across the Entire Operation

    Case Study 3:  Remaining 'Made in America'
    Case Study 4:  Moving from Self Management to Individual Productivity Reporting

    Case Study 5:  A Project from A to Z

    Case Study 6:  Products for Every Purpose
    Case Study 7:  Setting a Course for Success