Maintenance
An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.
Areas in which PVA has worked: » Click here for Case Study
-
Fleet Maintenance
- Heavy Equipment Maintenance
- Continuous Flow Production Plants Maintenance
- Building and Facilities Maintenance
- Maintenance Job Shops
- Aircraft Maintenance
- Rail Car Repair
- Train Servicing
- Locomotive Servicing
- Locomotive Maintenance
Performance Improvements:
- 40% in equipment uptime
- 50% in equipment reliability
- 25% in production throughput levels
- 100% in maintenance response time to production breakdowns
- 50% in maintenance overtime costs
- 200% in active supervision levels
- 25% in working capital requirements
- 50% in average daily backlog levels for non-emergency work
- 75% in non-specialized Contractor costs
- 25% in maintenance operating costs
- 39% in maintenance output levels
- 52% to 76% in operational effectiveness
- 25% in total amount of dwell time
- 15% in part and tool costs
Case Study: A Tale of Six Cities
