Consumer Goods

An experienced team of our Management Consultants could provide your organization with the management training and coaching required to deliver any number of the below performance improvements.


Areas in which PVA has worked:                                    » Click here for Case Study

 

  • Planning and Scheduling
  • Engineering
  • Production
  • Maintenance
  • Boxes
  • Fittings
  • Struts
  • Components
  • Shipping and Receiving 
  • Quality Assurance and Control
  • Warehouse

 

 

Performance Improvements:

 

  • 35% in labor costs structure
  • 50% in volume throughput (units produced per week)
  • 35% in labor productivity
  • 12% in manufacturing efficiencies
  • 300% in active supervision levels
  • 40% in number of days that finished product was in inventory
  • 50% in Inventory levels and carrying costs
  • 30% in waste and scrap levels
  • 20% in line capacity
  • 25% in volume throughput at automatic lines
  • 33% in first pass yield quality
  • 25% in downtime hours of equipment
  • 50% in ship-on-time requirements 
  • 100% in rework caused by the Shipping Department


    Case Study 1:  Remaining 'Made in America'
    Case Study 2:  Moving from Self Management to Individual Productivity Reporting

    Case Study 3:  A Project from A to Z

    Case Study 4:  Products for Every Purpose
    Case Study 5:  Setting a Course for Success